Final day, SHOW TIME for the robotics workshop.
The final practical, the assembly of the cross-connections in the remote, the perfection of the aluminum clamp, the screw through the 6mm holes, connecting motors diagonally, soldering of wires, the rubber chain, connecting the motor-remote-battery, connections had to be damn precise to not to flop the show.
My FIRST ROBOT was finally on its wheel. Project Tank was accomplished. I named it Bumble-B, after my fav. Autobot(Movie: Transformers). It was show time. Bumble-B was all set to roll out.
The final practical, the assembly of the cross-connections in the remote, the perfection of the aluminum clamp, the screw through the 6mm holes, connecting motors diagonally, soldering of wires, the rubber chain, connecting the motor-remote-battery, connections had to be damn precise to not to flop the show.
My FIRST ROBOT was finally on its wheel. Project Tank was accomplished. I named it Bumble-B, after my fav. Autobot(Movie: Transformers). It was show time. Bumble-B was all set to roll out.
